hello world!

Quick Summary

  • 2007
  • 22 km, 16” / 18,6”
  • CRA lined pipe
  • 100°C
  • U-value = 0,8 W/2.K
  • S-lay, 170 m WD
  • UK North Sea
Single-joint S-lay swaged PIP system to replace the first Dunbar PIP; an ITP system in operation since 1994. The Dunbar PIP was snake-laid to mitigate lateral buckling for this hot flowline.

Other References

crossmenu