AkerBP Aerfugl EHTF
The first active heating EHTF system deployed in Norwegian North Sea in collaboration with Subsea 7.
Read more
Total Dunbar II
Single-joint S-lay swaged PIP system to replace the first Dunbar PIP; an ITP system in operation since 1994. The Dunbar PIP was snake-laid to mitigate lateral buckling for this hot flowline.
Read more
Shell ETAP
Custom solution to meets Shell’s insulation requirements for the HP/HT flowline.
Read more
CRISP Subsea Bitumen Pipeline
Early engagement and competitive FEED lead to execution of this world’s first ultra-high temperature subsea bitumen PIP in Singapore.
2020
Read more
EF90 Buried LPG Pipeline
ITP was contracted by the operator Trafigura to provide PIP system, procurement, and on-site pre-fabrication supervision and construction / installation assistance in USA.
Read more
Camisea Subsea LPG
PIP Engineering & Supply
Design, procurement, pre-fabrication and field construction support for Camisea Subsea Pipeline Loading System
2004
Read more
Gujarat Buried Cryopipe
The world’s first fully buried Cryogenic pipeline for the loading of Ethane and LNG from an existing jetty to a new storage tank. The two parallel 24” lines are buried along a congested corridor with dozens of bends and several road crossings.
For the design temperature of -168°C , a high-performance PIP was required to limit boil-off gas and enable a fully constrained buried application, without expansion loops.
ITP was contracted in 2015 for the engineering, procurement, pre-fabrication and installation supervision. The system is operating since early 2017.
Read more
Tullow TEN Deepwater Flowlines
PIP double-joint flowline and gas injection line fabrication and supply for deepwater installation in West Africa.
Read more