Quick Summary

  • Location: Corpus Cristi, Texas, USA
  • Length: 2 x 1500 m
    • 1 x 8”/12”
    • 1 x 20”/24”
  • Pipelay method: Pulled in Horizontal Directional Drilling (HDD)
  • Product: LPG
  • Design Temperature: - 50ºC
  • Thermal requirement: U= 0.35 W/m².K
  • Installed since 2014
ITP was contracted by the operator Trafigura to provide PIP system, procurement, and on-site pre-fabrication supervision and construction / installation assistance in USA.

Engineering & Supply

Procurement, pre-fabrication and field construction support for Corpus Christi LPG.